COAL/BIOMASS WATER-TUBE BOILERS
Economiser after 90 days operation with out SAPEC
Economiser after 110 days operation with SAPEC
Coal fired boilers
RESULTS:
- Extended operation
- Improved coal to steam ratio
- Reduced cleaning periods
- 6.9 % saving in Fuel.
- 12 months operation between cleans with the SAPEC system.
- Cleaned easily without heavy abrasive cleaning methods. This helps to preserve the Boiler tubes as they are often damaged in an effort to remove hard bonded deposits (which leads to premature tube failure).
- SAPEC system ensures that the Boiler is operating at its maximum efficiency
- Lower cleaning costs.
- Pollution is also substantially reduced.
CO-FIRING WITH WOOD AND COAL- 12 months operation with SAPEC
- SAPEC system ensures that the Boiler is operating at its maximum efficiency
- Lower cleaning costs.
- Pollution is also substantially reduced.
Furnace area after 110 days operation with SAPEC
TRAVELLING GRATE WATER TUBE BOILERS
CO-FIRING WOOD WASTE AND COAL